General Information The attached model run results cover the period of November 26, 2013 through December 16, 2013 and are based on the following assumptions: Common Assumptions 1. CCFB Gates operate Priority 3 schedule for the entire forecast period. 2. The Delta Cross Channel gates will be opened on November 22nd at 2:00 pm, closed on November 25th at 9:00 am, opened on November 27th at 9:00 am and closed on December 1st at 5:00 pm. 3. The Old River at Tracy ag. barrier was removed on November 2nd, 2013. The Grant Line Canal ag. barrier was removed on November 1st, 2013. The Middle ag. barrier was removed on October 29th, 2013. 4. The head of Old River is not installed. 5. Suisun Marsh salinity control flashboards were installed and operation of the boatlock began on October 11, 2013. The three Suisun Marsh Salinity Control Gates are closed as of November 25th. 6. San Joaquin River flow at Vernalis is around 1,137 cfs at the beginning of the forecast period and decreases to 1,000 cfs by the end of the forecast period. 7. San Joaquin River EC at Vernalis is projected to increase from 753 umhos/cm to 831 umhos/cm by the end of forecast period. 8. Sacramento River flow at Freeport is around 8,902 cfs near the beginning of the forecast period and decreases to 8,800 cfs by the end of the forecast period. 9. Jones pumping is around 1,000 cfs at the beginning and end of the forecast period. 10. CCFB intake is around 1,500 cfs at the beginning and end of the forecast period.