General Information The attached model run results cover the period of February 25, 2014 through March 17, 2014 and are based on the following assumptions: Common Assumptions 1. CCFB Gates operate Priority 3 schedule for the entire forecast period. 2. The Delta Cross Channel gates were closed on Feb 10th at 10:00 AM. 3. The Old River at Tracy ag. barrier was removed on November 2nd, 2013. The Grant Line Canal ag. barrier was removed on November 1st, 2013. The Middle ag. barrier was removed on October 29th, 2013. 4. The head of Old River barrier is not installed. 5. Suisun Marsh salinity control flashboards were installed and operation of the boatlock began on October 11, 2013. The three Suisun Marsh Salinity Control Gates are being tidally operated as of December 2nd. 6. San Joaquin River flow at Vernalis is around 600 cfs at the beginning of the forecast period and will remain the same till the end of the forecast period. 7. San Joaquin River EC at Vernalis is projected to decrease from 792 umhos/cm to 785 umhos/cm by the end of forecast period. 8. Sacramento River flow at Freeport is around 7,350 cfs at the beginning of the forecast period and increases to 9,000 cfs by the end of the forecast period. 9. Jones pumping is at 700 cfs at the beginning of the forecast period and will be the same by the end of forecast period. 10. CCFB intake is at 800 cfs at the beginning of the forecast period and will be the same by the end of forecast period.