The model run results cover the period June 7, through June 27, and are based on the following assumptions: Common Assumptions 1. CCFB Gates are operating to Priority 3 throughout the forecast period. 2. The Delta Cross Channel gates are closed but will be open for the upcoming weekend of June 10 through June 13. 3. Suisun Marsh salinity control flashboards were removed on May 24, the three Suisun Marsh Salinity Control Gates are in open position. 4. The Middle River ag. barrier is installed with all 6 culvert flap-gates operating tidally. 5. The Old River at Tracy ag. barrier is installed with all 9 culvert flap-gates operating tidally. 6. The Spring Head of Old River barrier was installed on April 1, 2016 with all 8 culvert slide-gates open. The barrier was removed June 1. 7. The Grant Line Canal ag. barrier was partially installed on April 15, 2016 with all 6 culvert flap-gates tied open. The barrier was fully installed on June 8. 8. San Joaquin River flow at Vernalis is 765 cfs at the beginning of the forecast period and decreases to 525 cfs by the end of the forecast period. 9. San Joaquin River EC at Vernalis increases from 410 umhos/cm at the beginning of the forecast period to 590 umhos/cm by the end of forecast period. 10. Sacramento River flow at Freeport is at 13,062 cfs at the beginning of the forecast period and decreases to 12,600 cfs by the end of the forecast period. 11. CCFB is at about 3,600 cfs at the beginning of the forecast period and decreases to 1,400 cfs by the end of the forecast period. 12. Export at Jones Pumping Plant is at 800 cfs throughout the forecast period.