The model run results cover the period July 14 through August 3 and are based on the following assumptions: Common Assumptions 1. CCFB Gates are operating to Priority 3. 2. The Delta Cross Channel gates are open since June 26. 3. Suisun Marsh Salinity Control flashboards are in. All three gates are in tidal operation starting July 1. 4. San Joaquin River flow at Vernalis is at 604 cfs at the beginning of the forecast period and is estimated to decrease to 570 cfs by the end of the forecast period. 5. San Joaquin River EC at Vernalis is at 421 umhos/cm at the beginning of the forecast period and is estimated to increase to 438 umhos/cm at the end of the forecast period. 6. Sacramento River flow at Freeport is at 19047 cfs at the beginning of the forecast period and is expected to increase to 19500 cfs by the end of the forecast period. 7. CCFB inflow is at 5999 cfs at the beginning of the forecast period and is expected to increase to 6500 cfs by the end of the forecast period. 8. Export at Jones Pumping Plant is at 996 cfs at the beginning of the forecast period and is expected to increase to 4200 cfs to the end the forecast period. 9. The Middle River barrier gates began intermediate tidal operation on June 2 and switched to full operation on July 7. 10. The Old River near Tracy barrier gates began intermediate tidal operation on June 1 and switched to full operation on July 7. 11. The Grant Line Canal barrier gates began intermediate tidal operation on June 9 and switched to full operation on July 7.