General Information The attached model run results cover the period of October 22, 2013 through November 11, 2013 and are based on the following assumptions: Common Assumptions 1. CCFB Gates operate Priority 3 schedule for the entire forecast period. 2. The Delta Cross Channel gates will be closed on October 17, 2013 at 9:00 am, opened on October 18, 2013 at 3:00 pm, and closed on October 21, 2013 at 9:00 am. 3. The Old River at Tracy ag. barrier will be removed on November 1st, 2013. The Grant Line Canal ag. barrier will be removed on October 31st, 2013. The Middle ag. barrier will be removed on October 28th, 2013. 4. The head of Old River is not installed. 5. Suisun Marsh salinity control flashboards were installed and operation of the boatlock began on October 11, 2013. The three Suisun Marsh Salinity Control Gates are being tidally operated as of October 18, 2013. 6. San Joaquin River flow at Vernalis is assumed to decrease from 1,216 cfs to 1,200 cfs by the end of the forecast period. 7. San Joaquin River EC at Vernalis is projected to increase from 577 umhos/cm to 585 umhos/cm by the end of forecast period. 8. Sacramento River flow at Freeport is around 6,838 cfs near the beginning of the forecast period and increases to 7,300 cfs by the end of the forecast period. 9. Jones pumping is around 2,500 cfs around the beginning of the forecast period and decreases to 1,600 cfs by the end of the forecast period. 10. CCFB intake is around 800 cfs at the beginning and end of the forecast period.