General Information The attached model run results cover the period of October 29, 2013 through November 20, 2013 and are based on the following assumptions: Common Assumptions 1. CCFB Gates operate Priority 3 schedule for the entire forecast period. 2. The Delta Cross Channel gates will be opened on October 18, 2013 at 3:00 pm, closed on October 21, 2013 at 9:00 am, opened on October 31, 2013 at 9:00 am, and closed on November 4, 2013 at 9:00 am. 3. The Old River at Tracy ag. barrier will be removed on November 2st, 2013. The Grant Line Canal ag. barrier will be removed on November 1st, 2013. The Middle ag. barrier was removed on October 29th, 2013. 4. The head of Old River is not installed. 5. Suisun Marsh salinity control flashboards were installed and operation of the boatlock began on October 11, 2013. The three Suisun Marsh Salinity Control Gates are being tidally operated as of October 18, 2013. 6. San Joaquin River flow at Vernalis is assumed to decrease from 2,575 cfs to 1,200 cfs by the end of the forecast period. 7. San Joaquin River EC at Vernalis is projected to increase from 248 umhos/cm to 566 umhos/cm by the end of forecast period. 8. Sacramento River flow at Freeport is around 7,672 cfs near the beginning of the forecast period and decreases to 6,800 cfs by the end of the forecast period. 9. Jones pumping is around 818 cfs around the beginning of the forecast period and increases to 1,800 cfs by the end of the forecast period. 10. CCFB intake is around 991 cfs at the beginning of the forecast period and increases to 1,000 cfs by the end of the forecast period.