General Information The attached model run results cover the period of March 11, 2014 through April 1, 2014 and are based on the following assumptions: Common Assumptions 1. CCFB Gates operate Priority 3 schedule for the entire forecast period. 2. The Delta Cross Channel gates were closed on Feb 10th at 10:00 AM. 3. The Old River at Tracy ag. barrier was removed on November 2nd, 2013. The Grant Line Canal ag. barrier was removed on November 1st, 2013. The Middle River ag. barrier was removed on October 29th, 2013. 4. The head of Old River barrier is not installed. 5. Suisun Marsh salinity control flashboards were installed and operation of the boatlock began on October 11, 2013. The three Suisun Marsh Salinity Control Gates are being tidally operated as of December 2nd. 6. San Joaquin River flow at Vernalis decreases from 990 cfs at the beginning of the forecast period to 950 cfs by the end of the forecast period. 7. San Joaquin River EC at Vernalis is projected to increase from1,110 umhos/cm at the beginning of the forecast period to 1,170 umhos/cm by the end of forecast period. 8. Sacramento River flow at Freeport is around 19,930 cfs at the beginning of the forecast period and decreases to 9,650 cfs by the end of the forecast period. 9. Jones pumping is at 3,300 cfs at the beginning of the forecast period and decreases to 800 cfs by the end of forecast period. 10. CCFB intake is at 3,500 cfs at the beginning of the forecast period and decreases to 700 cfs by the end of forecast period.