General Information The attached model run results cover the period of April 22, 2014 through May 13, 2014 and are based on the following assumptions: Common Assumptions 1. CCFB Gates operate Priority 3 schedule for the entire forecast period. 2. The Delta Cross Channel gates were closed on Feb 10th at 10:00 AM. 3. The Old River at Tracy ag. barrier was installed with all flap gates tied open on April 4th, 2014.  On April 9th, all nine flap-gates are being tidally operated.  The Grant Line Canal ag. barrier was partially installed on March 28, 2014. The Middle River ag. barrier was installed with all flap gates tied open on March 17th, 2014.  On April 9th, all six flap-gates are being tidally operated 4.  The head of Old River barrier was installed on April 8th, 2014 with all 8 culvert slide gates opened. 5. Suisun Marsh salinity control flashboards were installed and operation of the boatlock began on October 11, 2013.  The three Suisun Marsh Salinity Control Gates are being tidally operated as of December 2nd. 6. San Joaquin River flow at Vernalis decreases from 2896 cfs at the beginning of the forecast period to 1440 cfs by the end of the forecast period. 7. San Joaquin River EC at Vernalis is projected to increase from 190 umhos/cm at the beginning of the forecast period to 390 umhos/cm by the end of forecast period. 8. Sacramento River flow at Freeport is around 6,345 cfs at the beginning of the forecast period and increases to 6,750 cfs by the end of the forecast period. 9. Jones pumping is at 2,360 cfs at the beginning of the forecast period and decreases to 1,000 cfs by the end of forecast period. 10. CCFB intake is at 500 cfs at the beginning and end of the forecast period.