The attached model run results cover the period of July 15, 2014 through August 5, 2014 and are based on the following assumptions: Common Assumptions 1. CCFB Gates operate Priority 1 schedule for the entire forecast period. 2. The Delta Cross Channel gates were opened on June 13th at 9:58 AM. 3. The Old River at Tracy ag. barrier is installed with all flap gates tidally operating as of April 8. 4. The Grant Line Canal ag. barrier is fully installed with all 6 culvert flap-gates tidally operated beginning June 25. 5. The Middle River ag. barrier is installed with all flap-gates tidally operated as of April 8. The barrier was raised 1 foot on June 26 at 3:00 PM. 6. San Joaquin River flow at Vernalis decreases from 242 cfs at the beginning of the forecast period to 200 cfs by the end of the forecast period. 7. San Joaquin River EC at Vernalis is projected to increase from 342 umhos/cm at the beginning of the forecast period to 411 umhos/cm by the end of forecast period. 8. Export at Jones Pumping Plant is at 800 cfs for the entire forecast period. With Transfers (Base Case, A) Assumptions 8. Sacramento River flow at Freeport is at 9,025 cfs at the beginning of the forecast period and increases to 9,300 cfs by the end of the forecast period. 9. CCFB intake is at 1,200 cfs for the entire forecast period. Without Transfers (B) Assumptions 8. Sacramento River flow at Freeport is at 9,025 cfs at the beginning of the forecast period and decreases to 8,095 cfs by the end of the forecast period. 9. CCFB intake is at 350 cfs for the entire forecast period.