The model run results cover the period of October 14, 2014 through November 3, 2014 and are based on the following assumptions: Common Assumptions 1. CCFB Gates operate Priority 2 schedule for the entire forecast period. 2. The Delta Cross Channel gates were opened on June 13th. 3. The Old River at Tracy ag. barrier is installed with all flap gates tidally operating as of April 8. 4. The Grant Line Canal ag. barrier is fully installed with all 6 culvert flap-gates tied open beginning on September 30. 5. The Middle River ag. barrier is installed with all flap-gates tidally operated as of April 8. The barrier was raised 1 foot on June 26. 6. The Fall-Head of Old River barrier was installed on October 1. 7. Suisun Marsh salinity control flashboards were installed and the three Suisun Marsh Salinity Control Gates are in open position as of October 7. 8. San Joaquin River flow at Vernalis is 409 cfs at the beginning of the forecast period and is anticipated to increase to 1,400 cfs by the end of the forecast period. 9. San Joaquin River EC at Vernalis is projected to decrease from 485 umhos/cm at the beginning of the forecast period to 185 umhos/cm by the end of forecast period. With Transfers (Base Case, A) Assumptions 10. Sacramento River flow at Freeport is at 5,519 cfs at the beginning of the forecast period and increases to 6,893 cfs by the end of the forecast period. 11. CCFB intake is at 295 cfs at the beginning of the forecast period and increases to 800 cfs by the end of the forecast period. 12. Export at Jones Pumping Plant is at 812 cfs at the beginning of the forecast period and will stay the same by the end of the forecast period. Without Transfers (B) Assumptions 10. Sacramento River flow at Freeport is at 5,519 cfs at the beginning of the forecast period and decreases to 5,723 cfs by the end of the forecast period. 11. CCFB intake is at 295 cfs at the beginning of the forecast period and increases to 800 cfs by the end of the forecast period. 12. Export at Jones Pumping Plant is at zero cfs at the beginning of the forecast period and will stay the same by the end of the forecast period.