The model run results cover the period December 6, through December 26, and are based on the following assumptions:

Common Assumptions

1. CCFB Gates are operating to Priority 3 throughout the forecast period.
2. The Delta Cross Channel gates are open throughout the forecast period.
3.  Suisun Marsh salinity control flashboards are in. The three Suisun Marsh Salinity Control Gates are in tidal operation through December 7, and in open position beginning December 8 throughout the end of the forecast period. 
4.  San Joaquin River flow at Vernalis is at 929 cfs at the beginning of the forecast period and decreases to 900 cfs by the end forecast period. 
5. San Joaquin River EC at Vernalis increases from 410 umhos/cm at the beginning of the forecast period to 590 umhos/cm by the end of forecast period.
6. CCFB is at 6,672 cfs at the beginning of the forecast period and will increase to 6,680 cfs by the end of the forecast period. 
7. Export at Jones Pumping Plant is at 2,453 cfs at the beginning of the forecast period and increases to 3,600 cfs by the end of the forecast period.