The model run results cover the period October 3, through October 23, and are based on the following assumptions: Common Assumptions 1. CCFB Gates are operating to Priority 3 throughout the forecast period. 2. The Delta Cross Channel gates are open from 10 AM Friday through10 AM Monday of every week for the entire forecast period. 3. Suisun Marsh salinity control flashboards are removed, and the three Suisun Marsh Salinity Control Gates are in open position throughout the forecast period. 4. The Middle River ag. Barrier is installed; all 6 culvert flap-gates are in tidal operation. 5. The Fall-Head of Old River barrier is anticipated to be installed by October 13 with all 6 culvert slide-gates in open position. 6. San Joaquin River flow at Vernalis is at 2,336 cfs at the beginning of the forecast period and will to be at 3,475 cfs at the end forecast period. 7. San Joaquin River EC at Vernalis decreases from 220 umhos/cm at the beginning of the forecast period to 180 umhos/cm by the end of forecast period. 8. Sacramento River flow at Freeport is at 19,068 cfs at the beginning of the forecast period and decreases to 11,450 cfs by the end of the forecast period. 9. CCFB is at 1,992 cfs at the beginning of the forecast period and will be at 2,000 cfs at the end of the forecast period. 10. Export at Jones Pumping Plant is at 4,400 cfs throughout the forecast period.