The model run results cover the period June 30 through July 20 and are based on the following assumptions: Common Assumptions 1. CCFB Gates are operating to Priority 2 through the end of the forecast period. 2. The Delta Cross Channel gates are open. 3. Suisun Marsh salinity control flashboards were removed and the three Suisun Marsh Salinity Control Gates are open. 4. The Middle River ag. Barrier is closed and all the culvert flap-gates are in tidal operation. 5. The Old River at Tracy ag. barrier is closed and all the culvert flap-gates are in tidal operation. 6. The Grant Line Canal ag. barrier is closed and all the culvert flap-gates are in tidal operation. 7. San Joaquin River flow at Vernalis is at 818 cfs at the beginning of the forecast period and is estimated to decrease to 500 cfs by the end of the forecast period. 8. San Joaquin River EC at Vernalis is at 302 umhos/cm at the beginning of the forecast period and is estimated to increase to 729 umhos/cm at the end of the forecast period. 9. Sacramento River flow at Freeport is at 12304 cfs at the beginning of the forecast period and is expected to increase to 12500 cfs by the end of the forecast period. 10. CCFB inflow is at 759 cfs at the beginning of the forecast period and is expected to increase to 1000 cfs by the end of the forecast period. 11. Export at Jones Pumping Plant is at 2573 cfs at the beginning of the forecast period and is expected to increase to 3500 cfs by the end forecast period.