The model run results cover the period March 22 through April 11, and are based on the following assumptions: Common Assumptions 1.CCFB Gates are operating to Priority 1 throughout the forecast period. 2. The Delta Cross Channel gates are closed throughout the forecast period. 3. Suisun Marsh Salinity Control flashboards are in, 2 of the Suisun Marsh Salinity Control Gates are in open position as of March 8, and 1 gate is closed for maintenance. 4. The temporary False River drought barrier was notched on January 7, but the notch will be filled back by April 10. 5. San Joaquin River flow at Vernalis is at 781 cfs at the beginning of the forecast period and is estimated to decrease to 700 cfs by the end of the forecast period. 6. San Joaquin River EC at Vernalis is at 739 umhos/cm at the beginning of the forecast period and is estimated to increase to 796 umhos/cm by the end of the forecast period. 7. Sacramento River flow at Freeport is at 8875 cfs at the beginning of the forecast period and is expected to decrease to 8650 cfs by the end of the forecast period. 8. CCFB inflow is at 597 cfs at the beginning of the forecast period and is expected to increase to 600 cfs by the end of the forecast period. 9. Export at Jones Pumping Plant is at 896 cfs at the beginning of the forecast period and is expected to increase to 900 cfs by the end of the forecast period.