The model run results cover the period November 8 through November 28, and are based on the following assumptions: Common Assumptions 1.CCFB Gates are operating to Priority 3 November 18,19,20, and 22 and to Priority 1 for the remainder of the forecast period. 2. The Delta Cross Channel gates are closed during weekdays and open during weekends. 3. Suisun Marsh Salinity Control flashboards are in, 2 gates are in tidal operation, and 1 gate remains closed for maintenance as of September 1. 4. The temporary False River drought barrier was breached as of November 1st. 5. The Middle River ag. barrier is closed with all the culvert flap-gates in tidal position. The barrier is scheduled to be breached by November 16. 6. The Old River at Tracy ag. barrier was breached on November 4. 7. The Grant Line Canal ag. barrier was breached on November 7. 8. San Joaquin River flow at Vernalis is at 692 cfs at the beginning of the forecast period and is estimated to decrease to 500 cfs by the end of the forecast period. 9. San Joaquin River EC at Vernalis is at 337 umhos/cm at the beginning of the forecast period and is estimated to increase to 369 umhos/cm by the end of the forecast period. 10. Sacramento River flow at Freeport is at 7900 cfs at the beginning of the forecast period and is expected to decrease to 7500 cfs by the end of the forecast period. 11. CCFB inflow is at 988 cfs at the beginning of the forecast period and is expected to decrease to 500 cfs by the end of the forecast period. 12. Export at Jones Pumping Plant is at 905 cfs at the beginning of the forecast period and is expected to increase to 1800 cfs by the end of the forecast period