The model run results cover the period July 7 through July 27 and are based on the following assumptions: Common Assumptions 1. CCFB Gates are operating to Priority 3. 2. The Delta Cross Channel gates are open since June 26. 3. Suisun Marsh Salinity Control flashboards are in. All three gates are in tidal operation starting July 1. 4. San Joaquin River flow at Vernalis is at 661 cfs at the beginning of the forecast period and is estimated to decrease to 600 cfs by the end of the forecast period. 5. San Joaquin River EC at Vernalis is at 404 umhos/cm at the beginning of the forecast period and is estimated to increase to 431 umhos/cm at the end of the forecast period. 6. Sacramento River flow at Freeport is at 18464 cfs at the beginning of the forecast period and is expected to increase to 20100 cfs by the end of the forecast period. 7. CCFB inflow is at 5994 cfs at the beginning of the forecast period and is expected to increase to 6680 cfs by the end of the forecast period. 8. Export at Jones Pumping Plant is at 902 cfs at the beginning of the forecast period and is expected to decrease to 900 cfs to the end the forecast period. 9. The Middle River barrier gates began intermediate tidal operation on June 2 and switched to full operation on July 7. 10. The Old River near Tracy barrier gates began intermediate tidal operation on June 1 and switched to full operation on July 7. 11. The Grant Line Canal barrier gates began intermediate tidal operation on June 9 and switched to full operation on July 7.