The attached model run results cover the period November 3 through November 23 and are based on the following assumptions: Common Assumptions 1. CCFB Gates are operating to Priority 1. 2. The Delta Cross Channel gates are closed on the weekdays and open on the weekends. 3. Suisun Marsh Salinity Control flashboards are in. All three gates are in tidal operation starting October 28. 4. San Joaquin River flow at Vernalis is at 1725 cfs at the beginning of the forecast period and is estimated to decrease to 1218 cfs by the end of the forecast period. 5. San Joaquin River EC at Vernalis is at 335 umhos/cm at the beginning of the forecast period and is estimated to increase to 357 umhos/cm at the end of the forecast period. 6. Sacramento River flow at Freeport is at 7654 cfs at the beginning of the forecast period and is expected to increase to 9300 cfs by the end of the forecast period. 7. CCFB inflow is at 994 cfs at the beginning of the forecast period and is expected to increase to 1000 cfs by the end of the forecast period. 8. Export at Jones Pumping Plant is at 934 cfs at the beginning of the forecast period and is expected to decrease to 900 cfs to the end the forecast period. 9. The Middle River gates will be breached on November 18. 10. The Old River near Tracy barrier was breached on October 27. 11. The Grant Line Canal barrier was breached on November 4.